Intensive green roof systems are designed to be used as recreational spaces and often involve many features similar to traditional ground level gardens which can include paving, water features, lawns, shrubs and trees. These intensive 'roof gardens' are soil based multi layered systems and are so called because they are labour-intensive; requiring higher levels of irrigation, feeding, and other forms of maintenance compared to their extensive counterparts.

Intensive green roof build-ups can be installed above the completed Parabit Solo Hot Melt Roofing System, acting as ballast and a water attenuation system. For further assistance, refer to the Icopal Green Roof section of this website or contact Icopal’s Technical Department.

Parabit Solo Hot Melt System - Intensive Green Roofs 

1 Green Roof System   6 Icopal Bitumen Primer
         
2 Monarperm TP160 Water Reducing Layer   7 Parabit Hot Melt Compound
         
3 Thermazone Hydroshield IVR Insulation   8 Rootbar Sand Capsheet
         
4 Rootbar Sand Capsheet   9 Rootbar Mineral Capsheet
         
5 Parabit Solo Membrane   10 Cement faced insulation, to upstand

 

Waterproofing System

Install the Parabit Solo Hot Melt Waterproofing System in accordance with the methods outlined in the Parabit Solo hot melt installation manual, inclusive of the Rootbar Sand protection layer.

Note: Prior to application of any ballast or thermal insulation, it is recommended that the finished hot melt roofing membrane be electronically integrity tested to ensure the roof has been thoroughly inspected, checked and passed off as being watertight.

Root Protection Layer

For green roof system build-ups, Rootbar Sand Protection Layer is installed instead of the standard Power Elastomeric 250 Protection Layer, install Icopal Rootbar Capsheet, directly to the Power Elastomeric 250 layer.

Rootbar Capsheet flat roofing membranes are applied by torch-on application using a standard roofer’s torch. The membranes should be heated carefully ensuring the heat dispersible film on the underside is completely removed as work proceeds and ensuring a continuous 5mm bead of bitumen is extruded from all laps. Side laps must follow the manufactured mineral free selvedge with end laps a minimum of 150mm. The cap sheet should be offset 300mm from the Power Elastomeric 250 to avoid side build up. End laps should also be offset.
At the end of the working day, all areas should be completely sealed.

Drainage Layer (depending upon specification)

Where rapid removal of rainwater is desired or where installing above a roof deck with zero falls, install an appropriate drainage board over the completed Parabit Duo Hot Melt Roofing System immediately after the leak detection test on horizontal surfaces. If testing is delayed, install a temporary covering to protect the Parabit Duo Hot Melt Roofing System from damage by other trades.

Thermal Insulation

Where specified, install the thermal insulation in accordance with current instructions.

Surfaces should be clean and free of debris.

Inverted roof insulation boards are laid above the completed waterproofing system in a staggered, break-bond pattern ensuring all boards are laid flat and close butted to minimise cold bridging. The insulation boards should be cut accurately around any penetrations using a fine tooth saw or hot wire cutter.

The insulation boards should be laid in conjunction with a filtration (fleece) layer in an advancing manner, with appropriate ballast subsequently distributed to restrain the system.

The filter fleece must be laid with a minimum 150mm overlaps. If using Monarperm water reducing layer laps must be sealed immediately after positioning using Monobond LT double sided tape. Ensure a full seal at all joints by applying firm even pressure with a hand roller. All penetrations through the membrane should also be carefully sealed.

Green Roof System /Ballast

Install the green roof system, in accordance with project specification and current installation guidelines.
Please refer to Icopal’s green roof section of this website for clarification of green roof specifications or contact Icopal’s Technical Department.

    Contact Icopal 0161 8654444

    Find Local Support

    To discuss your project in more detail please contact
    Your Local Area Manager

     

    Technical Support

    Telephone:

    0330 123 4585

    Email: technical.uk@bmigroup.com

     

    Sales Enquiries & Orders

    Telephone:

    0843 224 7400

    Fax:

    0843 224 7401

    Email: sales.admin@bmigroup.com

    Latest News

    BMI’s apprentice competition demonstrates its commitment to roofing’s future

    Read more...

    BMI UK & Ireland launches to the UK construction industry

    Read more...

    BMI hosts a meeting of minds

    Read more...

    BMI Building Futures For Veterans

    Read more...

    The Best From The West

    Read more...

    Hot melt provides great result for sports area

    Read more...

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    Icopal: We Protect Your Building