ICS1006-horbury-school

Horbury School

Project Overview

Project: Horbury School, Wakefield
Area: 1,500 m²
Completion Date: February 2009
Contractor: Watershed (Roofing) Ltd, Bradford
Client: Wakefield Metropolitan District Council
Specifier: NPS Group
Main Contractor: Miller Construction Ltd, Normanton
System: SureWeld TPO, Extensive Sedum RoofMonarfloor Tranquilt

download pdfDownload this case study

Background

Horbury-School-02Designed by NPS North East property consultants, and built by Miller Construction the building is steel-frame with metal stud and plasterboard internal walls, with heavyweight concrete floors and roofs to help to reduce overheating. This provides good levels of acoustic separation and reduces fabric heat losses to 10% lower than Building Regulations requirements.

Challenge

Horbury-School-03The new school project was phased over a three-year programme, with demolition and rebuilding on the 11,500m² site continuing while the 1000 pupil school remained open.

The brief for the new school was to design a college based on the Building Schools for the Future layouts, and this included the requirement of a "very good" sustainability rating, as measured through the BRE's Environmental Assessment Method (BREEAM).

Solution

Icopal’s Monarfloor Tranquilt lightweight acoustic isolation system is capable of exceeding the requirements of the Part E & Building Bulletin 93 regulations in terms of impact and airborne sound insulation. It was installed under the floor screed on the ground and first floors including beneath the canteen and meeting areas of the central atrium to limit noise transmission.

In addition on phase one, Icopal’s extensive sedum green roof system incorporating the Total Torch and Rootbar capsheet system, was installed by Watershed Roofing on the roofs of the science and art and design technology classrooms.

On the other roof areas, Watershed Roofing installed Icopal's Sure-Weld TPO which is a fully recyclable advanced Thermoplastic Polyolefin single-ply roofing membrane that is free of PVC and specially formulated for long-term exposure Without the use of either polymeric or liquid plasticisers.

The three types of building membrane from Icopal have helped the new £22 million school in Wakefield achieve its ‘very good’ BREEAM rating.
The project had a tight programme which was hindered by bad weather but the Icopal products performed very well and the end result is excellent.
The school was officially re-opened in July 2009 by Ed Balls MP, the Secretary of State for Children, Schools and Families. 

Horbury-School-04 

 

    Contact Icopal 0161 8654444

    Find Local Support

    To discuss your project in more detail please contact
    Your Local Area Manager

     

    Technical Support

    Telephone:

    0330 123 4585

    Email: technical.uk@bmigroup.com

     

    Sales Enquiries & Orders

    Telephone:

    0843 224 7400

    Fax:

    0843 224 7401

    Email: sales.admin@bmigroup.com

    Latest News

    The Roaring Twentie's – and 40's – see BMI take shape

    Read more...

    BMI's training facilities claim academy status

    Read more...

    Leeds duo take the hounours at BMI Apprentice of the Year

    Read more...

    BMI reveals roofing's top 20 for the Apprentice of the Year final

    Read more...

    BMI crowns the highest building in the West Country

    Read more...

    Winners and contenders alike praise the BMI Apprentice of the Year competition

    Read more...

    BMI National Training Centre flattens Ceiran’s learning curve

    Read more...

    Complexity simplified with BMI Icopal’s Total Torch system curve

    Read more...

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    Icopal: We Protect Your Building