Icopal Noxite Roofing, Morden Mount Primary School, Greenwich

Morden Mount Primary School, Greenwich

Project Overview

Project: Morden Mount Primary School, Greenwich
Area: 1,600 m²
Completion Date: September 2012
Contractor: Capital Roofing Co Ltd, Blackheath
Client: Greenwich London Borough Council
System: Profiles System with Noxite Eco-Activ Mineral capsheet

download pdfDownload this case study

Background

The school had experienced many leaks over the years but six roofs continually caused disruption to the school. At the request of the school and Greenwich Borough council, Capital Roofing was asked to carry out a full survey of the roofs in question.
They identified some areas that required extensive alterations and some asbestos removal to skylights and water tank glass enclosures on two of the roofs.

Challenge

ICS1051-Morden-Mount-Primary-School-Greenwich_776x560The water-tank enclosures comprised vertical wired-glass panels which served no real lighting purpose. The panels extended right down to the existing roof covering meaning upstand detailing would be problematic.
The school head was also keen to use eco-friendly products when possible. With this in mind Capital Roofing asked Icopal to visit site to provide a roof waterproofing specification, and to design a tapered insulation scheme.

Solution

The overlay specification to the existing asphalt surface used Icopal's Profiles Vapour Vent XL vapour control layer, Thermazone Torch-on insulation, and Profiles Vent XL underlay. The system was finished with Icopal's Eco-Activ Noxite Mineral Capsheet.
Tapered insulation was installed to 70% of the insulated roof area to increase thermal performance and provide positive falls for efficient roof drainage. Due to the increase in height, kerb details were raised. The glass panels around the water tanks were removed and replaced with a new PVC cladding, allowing the detail to be properly waterproofed.

Twenty-one skylights were replaced with new units, and new guttering was installed where required. Icopal's Elastoflex liquid-applied waterproofing system was used in small areas adjacent to the existing hall windows due to the type of vertical panels originally installed. This allowed a better seal to be created to the panels, where membrane installation would have been tricky to detail.

The School Head was absolutely delighted with the works and finish, and the project was carried out to programme and to budget.

Richard Perrett, Surveyor for Greenwich Council, commented ‘I was very impressed with the quality of workmanship carried out on this project. Having read more about the Noxite capsheet and having seen the appearance, I would not hesitate to recommend this product on future projects’.

ICS1051-Morden-Mount-Primary-School-Greenwich_765x533

 

    Contact Icopal 0161 8654444

    Find Local Support

    To discuss your project in more detail please contact
    Your Local Area Manager

     

    Technical Support

    Telephone:

    0330 123 4585

    Email: technical.uk@bmigroup.com

     

    Sales Enquiries & Orders

    Telephone:

    0843 224 7400

    Fax:

    0843 224 7401

    Email: sales.admin@bmigroup.com

    Latest News

    Oscar heads for the limelight

    Read more...

    BMI helps Children in Need keep young people safe

    Read more...

    Everyone's a winner - that's the truth!

    Read more...

    BMI helps shield school children from sea storms

    Read more...

    The Roaring Twentie's – and 40's – see BMI take shape

    Read more...

    BMI's training facilities claim academy status

    Read more...

    Leeds duo take the hounours at BMI Apprentice of the Year

    Read more...

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    Icopal: We Protect Your Building