Lighthouse Power Building, Dover Harbour - Liquid-Applied Waterproofing

Lighthouse Power Building, Dover Harbour

Project Overview

Project: Lighthouse Power Building, West Docks
Area: 220 m²
Completion Date: October 2012
Contractor: G. Baker Roofing Ltd, Kent
Client: Dover Harbour Board 
System: Elastoflex Liquid Applied Waterproofing

download pdfDownload this case study

Background

ICS1043-Lighthouse-Power-Building-Dover-Harbour_381x266The Lighthouse Power Building for the Western Docks forms part of the outer harbour wall and is one of several lighthouses located around the port. Access to the lighthouse is provided by Admiralty Pier which was initially constructed over 150 years ago.

Relentless pounding by sea waves has taken its toll on certain parts of the piers upper concrete concourse. The existing surface covering had sustained considerable damage with pockets of concrete missing in certain places.

As part of a planned refurbishment programme, the Port of Dover requested the specification of a new waterproofing membrane that would be capable of receiving pedestrian traffic to the lighthouse whilst also providing a level of surface protection that could withstand regular buffeting by the sea .

Challenge

The proposed waterproofing membrane needed to offer excellent durability properties in a hostile environment and be tolerant to the high saline content of the English Channel. Furthermore, the waterproofing membrane needed to provide anti-skid surface whereby access to the lighthouse at the end of the pier could be maintained. Such demanding criteria eliminated many typical membranes options, leaving Icopal’s Elastoflex Liquid Waterproofing System as the obvious solution.

Solution

The proposal required the Elastoflex liquid-applied membrane to be applied above the prepared and primed concrete surface with many of the damaged concrete pockets being filled and levelled before any waterproofing works could begin. The Elastoflex membrane was installed in two coats in conjunction with the polyester reinforcing fabric. Once cured, the Elastoflex Anti-Skid System incorporating a coloured quartz sand finish, was applied. This provided the anti-skid surface finish necessary for pedestrian access whilst also achieving a tough, durable skin that would provide a considerable level of protection against the crashing winter waves.

The project was completed during the summer months without delay or inconvenience to the port authority, and achieved an excellent aesthetic finish prompting complimentary comments from the client .

 

    Contact Icopal 0161 8654444

    Find Local Support

    To discuss your project in more detail please contact
    Your Local Area Manager

     

    Technical Support

    Telephone:

    0330 123 4585

    Email: technical.uk@bmigroup.com

     

    Sales Enquiries & Orders

    Telephone:

    0843 224 7400

    Fax:

    0843 224 7401

    Email: sales.admin@bmigroup.com

    Latest News

    The Roaring Twentie's – and 40's – see BMI take shape

    Read more...

    BMI's training facilities claim academy status

    Read more...

    Leeds duo take the hounours at BMI Apprentice of the Year

    Read more...

    BMI reveals roofing's top 20 for the Apprentice of the Year final

    Read more...

    BMI crowns the highest building in the West Country

    Read more...

    Winners and contenders alike praise the BMI Apprentice of the Year competition

    Read more...

    BMI National Training Centre flattens Ceiran’s learning curve

    Read more...

    Complexity simplified with BMI Icopal’s Total Torch system curve

    Read more...

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    Icopal: We Protect Your Building