ICS1012-chimney-pot-park

Chimney Pot Park, Salford

Project Overview

Project: Chimney Pot Park Housing Scheme, Salford
Area: 13,000 m²
Completion Date: June 2005
Contractor: MAC Roofing & Contracting Ltd, Wirral
Client: Urban Splash
Architect: ShedKM, Liverpool
System: Monarperm 700 pitched roof underlay, Tecnatorch SBS (terrace areas)

download pdfDownload this case study

Background

Chimney-Pot-Park-02Designed by Shedkm architects and developed by Urban Splash in partnership with Salford City Council, Chimney Pot Park has revitalised terraced living and a previously dilapidated area of Salford marked for demolition into modern and affordable housing for local families and young professionals.

The area of Seedley and Langworthy had been suffering from neglect and crime for years, and as with many older inner urban areas with a history in the 19th century manufacturing industry, the age, the lack of demand for this type of housing and a slump in house prices led to a physical decline and an increase in people leaving the area.

The £40 million project transformed a stock of 349 run-down two-bedroom terraced houses into contemporary homes with a living area upstairs and two ground-floor bedrooms. With most properties marketed for just under £100,000, the first phase of completion saw more than 100 houses snapped up in under three hours.

Challenge

Chimney-Pot-Park-03It was a demanding and complicated project with the major concern at the time being the limited storage space for materials on site.

Also, in order to get maximum use of space on the site footprint, the roof space was opened up to create vaulted ceilings with mezzanine levels for living rooms and kitchens. Height was at a premium and the roof construction had to be kept as thin as possible.

Solution

With such a focus on roof space Icopal's Monarperm 700 vapour-permeable membrane was used beneath the slate roof, which when designed correctly can eliminate the need for traditional eaves and ridge ventilation, thus helping reduce the thickness of the roof structure.

In addition, 8,000m² of Icopal's Tecnatorch SBS torch-on roofing capsheet, with its unique patented groove technology which allows fast application and saves energy during application without detriment to bond strength or waterproofing integrity, was installed under the decks of the roof terraces that give access to the living areas at first floor level.

With limited storage available, a very tight supply window was given to Icopal to replenish the stocks on site and Icopal's logistics helped to make the job run smoothly. 

Chimney-Pot-Park-05 

    Contact Icopal 0161 8654444

    Find Local Support

    To discuss your project in more detail please contact
    Your Local Area Manager

     

    Technical Support

    Telephone:

    0330 123 4585

    Email: technical.uk@bmigroup.com

     

    Sales Enquiries & Orders

    Telephone:

    0843 224 7400

    Fax:

    0843 224 7401

    Email: sales.admin@bmigroup.com

    This site uses cookies in accordance with our Website Privacy Policy. By continuing to browse the site you are agreeing to our use of cookies. To browse without the use of cookies, you can opt-out as explained in our Website Privacy Policy or adjust your cookie settings for your browser

    Icopal: We Protect Your Building